Skip to content

The next batch starts with an approved part.

Small FDM runs, revision control, and planning for a different process when your quantity or requirements change.

What a repeat run needs

  • An approved revision and sample

    The file revision the batch is made from, and a sample or the first article as the reference. A prototype that worked is an agreed starting point, not an automatic guarantee of production suitability.

  • Quantity and inspection scope

    How many, and which features are measured on which parts. Calipers on agreed features, written into the quote.

  • A delivery date

    Standard printing takes 3–5 business days after approval, confirmed for the batch size. Larger batches are scheduled when the quote is accepted.

  • How a design change is handled

    A change to the file is a new revision. It is reviewed, the sample is remade, and the reorder runs from the new approval.

Made here

Small FDM runs

Tens to low hundreds when FDM suits the part. Made from the approved revision in the agreed material, measured on the agreed features, and delivered by pickup or courier in Chicago.

Planning the next process

When FDM stops fitting

When quantity, material, or tolerance moves past FDM, the work is a requirements and drawing handoff: what the part must do, the features that matter, and a drawing the next process can quote from. Supplier feasibility is assessed per project. There is no standing supplier network behind this page.

Terms

How this work is priced

Mechanical design in Creo
$145/hr · one-hour minimum
GD&T and tolerance analysis
$185/hr · one-hour minimum
Printed parts
From $60, quoted from the file
Next-process planning
Quoted per project
First reply
4 business hours

Scoped before it starts. If it runs over, you hear while there is still a decision to make.

Send the approved part. We'll confirm the run.

Plan your next run